My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Projects Under Construction <br /> Greeley and Loveland Irrigation Company— Equalizer Dam Rehabilitation • <br /> Authorization: SB 98-1189 County: Larimer—E of Loveland <br /> Water Source: Big Thompson River Project Yield: 885 ac.ft. <br /> Terms of Loan: $308,000 @ 4.21%for 30 years Project Type: Dam Rehabilitation <br /> This project is the rehabilitation of the Greeley &Loveland Irrigation Company's Equalizer <br /> Reservoir located east of Loveland. The project includes replacement of the dam outlet gate with a <br /> new structure, which will incorporate both the outlet gate and a spillway. The existing dam <br /> embankment will also be raised almost four feet. ECI Consultants, Inc. of Englewood prepared the <br /> construction plans and specifications with the construction contract awarded to Schmuesor and <br /> Associates, Inc. of Wheatridge, CO. Construction commenced on November 16, 1998 and was <br /> completed in early March 1999. Project documentation and final accounting is currently underway <br /> with substantial completion scheduled for late March 1998. <br /> Wamsley Cattle Company-Pole Mountain Dam <br /> Authorization: HB 93-1273 County: Jackson—SW of Walden <br /> Water Source: Off-Stream Drainage Project Yield: 1,905 ac.ft. <br /> IP <br /> Terms of Loan: $45,000 @ 3%for 40 years Project Type: Dam Rehabilitation <br /> This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br /> Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br /> dam's upstream slope. The work is 99% complete with the final inspection by the State Engineer's <br /> office recently completed. A punch list of several items needs to be completed before the State <br /> Engineer will approve the reservoir's filling plan. Substantial completion is scheduled for May <br /> 1999. <br /> Buffalo Mutual Irrigation Company—Buffalo Mutual Irrigation Diversion Structure Rehabilitation <br /> Authorization: SB 97-008 County: Prowers—E of Lamar <br /> Water Source: Arkansas River Project Yield: 17,560 ac.ft. <br /> Terms of Loan: $378,750 @ 3.75%for 30 yrs Project Type: Diversion Structure <br /> This $325,000 project is the re-construction of the Buffalo Mutual Irrigation Company's <br /> diversion structure and headgate on the Arkansas River in Prowers County 17 miles east of the City <br /> of Lamar. Wright Water Engineers of Denver, Colorado completed project design and preparation <br /> of construction contract documents. The construction contract was awarded to TLM Constructors, <br /> Inc. of Swink, Colorado and construction commenced September 21, 1998. The project is 99% <br /> • <br /> complete with project documentation and final accounting currently underway. Substantial <br /> completion is scheduled for April 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.