My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. _ <br /> STATE OF COLORADO <br /> Colorado Water Conservation Board <br /> Department of Natural Resources I,` tt <br /> • 1313 Sherman Street 1 <br /> Denver,Colorado 80203 �'':7 9 <br /> Phone:(303)866-3441 <br /> FAX: (303)866-4474 <br /> Bill Owens <br /> Governor <br /> Greg E.Watcher <br /> Executive Director,DNR <br /> Peter H.Evans <br /> Director,CWCB <br /> MEMORANDUM <br /> TO: Colorado Water Conservation Board Members G,, <br /> "1Q. <br /> FROM: Bill Stanton,P.E., Chief, Project Planning and Construction Secti n <br /> Mike Serlet,P.E., Design and Construction Project Manager <br /> DATE: March 22, 1999 <br /> SUBJECT: Agenda Item 2A.g.—March 29-30, 1999,Board Meeting <br /> Water Project Construction Loan Program <br /> IIIDesign and Construction Status Report <br /> The CWCB Project Planning and Construction Section has completed 9 projects in FY 98- <br /> 99. Currently we have 12 projects under construction and 11 projects in the design phase. <br /> The attached spreadsheet summarizes project status including budget, construction <br /> schedule, and progress to date. Three projects were completed during the current reporting period <br /> and are summarized at the end of this report. <br /> The attached progress report briefly outlines all active project design and construction <br /> information and progress to date. <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.