My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WESTERN MUTUAL DITCH CO.—CHECK DAM REHABILITATION PROJECT <br /> %Nat 4_,.1.1 <br /> a r . <br /> hit <br /> alt d+' .y �► <br /> 1.1 <br /> Looking D/S at the Check Dam Along the Side-Channel West of the Main Channel Diversion <br /> Project Description <br /> • This project is the construction of a side-channel check dam west of the Western Mutual <br /> Ditch Company's main diversion structure on the South Platte River west of Platteville. The <br /> structure is designed to back up side-channel water during low flows, re-directing it toward the <br /> ditch head-gates located on the opposite bank of the river's main channel. The project was <br /> designed by Rocky Mountain Consultants of Longmont, CO. and constructed by Kemp & <br /> Hoffman, Inc. of Northglenn, CO. After a lengthy right-of-way and access dispute with the <br /> adjacent property owner the project commenced in January 1999 and was completed in March <br /> 1999. <br /> Project Data <br /> Sponsor: Western Mutual Ditch Company County: Weld River: South Platte River <br /> Terms of Loan:$100,000 @ 3.75% for 20 yrs Substantial Completion Date: Mar. 10,1999 <br /> Design Engineer: Rocky Mountain Consultants, Inc.—Longmont, Colorado <br /> Construction Contractor: Kemp &Hoffman,Inc.—Northglenn, Colorado <br /> Design Criteria: Length of Check Dam= 120 feet <br /> Height of Check Dam=7 feet <br /> Type of Dam=Steel Sheet Piling with Treated Timber Flashboards <br /> • Annual Volume of Water Delivered by the Project: 20,000 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.