Laserfiche WebLink
Projects Under Design <br /> Windsor Reservoir and Canal Company-Various Canal and Reservoir Rehabilitations <br /> Authorization: SB 96-153 County: Larimer-N. of Ft. Collins <br /> Water Source: Cache La Poudre Project Yield: 30,000 ac. ft. <br /> Terms of Loan: $2,357,000 @4.15% for 30 years Project Type: Canal/Res. Rehabilitation <br /> In 1995 the Windsor Reservoir and Canal Company retained the services of Smith <br /> Geotechnical to evaluate the current condition of their 25 miles of canal and 6 reservoirs. Smith <br /> Geotechnical identified approximately$3,400,000 in recommended improvements, with a proposed <br /> design and construction time frame of 15-years. The projects identified consisted of the Poudre <br /> Valley Canal, Cobb Lake Pipeline and Outlet/Inlet Structures,Windsor Reservoir No. 8,Annex No. <br /> 8 and Elder Reservoir Outlet Structure. The Poudre Valley Canal and the Cobb Lake <br /> improvements have been designed and constructed. The design on Annex No. 8, Windsor No. 8 <br /> and Elder Reservoir are currently underway, with construction planned to commence in the fall of <br /> 2000. Construction may consist of 1, 2 or all 3-reservoir projects, depending on the direction of <br /> the Ditch Company. <br /> Pine River Canal Company—Pine River Canal Rehabilitation at Tunnel Hill <br /> Authorization: SB 99-173 County: La Plata—SE of Ignacio <br /> Water Source: Pine River Project Yield: 71,000 acre feet <br /> Terms of Loan: $243,000 @ 3.5%for 20 yrs. Project Type: Canal Rehabilitation <br /> • <br /> This $325,000 project is the rehabilitation of the Pine River Canal at the Tunnel Hill site, <br /> located 8 miles southeast of Ignacio. The project consists of replacing a water supply tunnel in <br /> poor condition,with approximately 700 lineal feet of 72-inch diameter concrete pipe, bypassing the <br /> tunnel completely. The Natural Resource Conservation Service has completed the design plans <br /> with CWCB staff completing the construction bid documents. The Pine River Canal Company is <br /> currently obtaining bids to complete the work. Construction is tentatively scheduled to commence <br /> in April 2000. <br /> Ryan Gulch Reservoir Company—Ryan Gulch Dam Rehabilitation <br /> Authorization: SB 99-173 County: Larimer—S. of Loveland <br /> Water Source: Big Thompson River Project Yield: 645 ac.ft. <br /> Terms of Loan: $317,500 @4.25%for 30 years Project Type: Dam Rehabilitation <br /> This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of <br /> a new spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch <br /> outlet pipe, and constructing a new upstream controlled inlet works. Boyle Engineering, Inc. of <br /> Denver has completed the final design plans, which are currently under review at the State <br /> Engineer's Office. Construction is scheduled to commence in June of 2000. <br /> Highland Ditch Company—Foothills Reservoir Dam Rehabilitation <br /> • <br /> Authorization: SB 98-1198—Severance Tax County: Boulder—W of Longmont <br /> Water Source: St. Vrain River Project Yield: 450 ac.ft. <br /> Terms of Loan: $1,040,000 @ 4.0% for 30 years Project Type: Dam Rehabilitation <br />