Laserfiche WebLink
TABLE 1-FY2012-13 Gage Projects <br /> Div.I Project Name Description of Work TOTAL <br /> South Platte River nr Kersey Install radar unit $ 355.77 <br /> Big Thompson near La Salle Repair gage shelter roof $ 118.69 <br /> • <br /> South Platte River nr Balzac Build sand dam to direct flow to gage $ 330.00 <br /> Denver Metro Excel Energy Connect to Excel DCP $ 224.23 <br /> Div.II <br /> Arkansas River above Pueblo Reservoir Staff gage-new inflow location $ 100.00 <br /> Muddy Creek near Toonerville Install wire weight gage $ 1,150.00 <br /> Lake Creek above Twin Lakes Repair gage $ 39.84 <br /> LAWMA Aug Stn gage Retrofit new intakes on stilling wells $ 113.70 <br /> Verhoeff Flumes Retrofit new intakes on stilling wells $ 156.39 <br /> Div.III <br /> Rio Grande River nr Del Norte Replaced cableway w/new A frames $ 8,498.64 <br /> Rio Grande River at 30-mile Bridge Retaining wall and outside staff gage. $ 2,159.30 <br /> Rio Grande River above Trinchera Creek Retaining wall and outside staff gage. $ 147.71 <br /> Conejos nr LaSauses(South Channel) Installed outside staff gage. $ 147.71 <br /> Spanish Creek nr Crestone Clean gage pool,inlet work $ 370.22 <br /> San Isabel Creek nr Crestone Built V-notch weir and relocated gage. $ 1,093.78 <br /> Paint and float supplies for Div 3 gages Various locations $ 1,479.90 <br /> Ventilation fans for 5 gages Various locations $ 301.27 <br /> New steps for RIOMONCO&TRIMTNCO Built new steps to gage house $ 127.28 <br /> Rio Grande Reservoir Relocated staff gage $ 220.71 <br /> Temporary labor to assist with projects above $ 2,731.13 <br /> Div.IV <br /> Kannah Creek nr Grand Junction Replaced inlet $ 28.99 <br /> Leroux Creek above Carl Smith Reservoir Refurbished control $ 271.70 <br /> Uncompahgre River upstream of South Canal Installed cantilever gage $ 127.98 <br /> • <br /> South Canal Installed bubbler and extended line $ 187.08 <br /> Redlands Canal ADVM platform repair $ 88.92 <br /> Uncompahgre River at UNCOLACO Bank stabilization <br /> Div.V <br /> Tenmile Creek below Copper Mtn Staff gage $ 141.96 <br /> Fryingpan River near Thomasville CFB line extension $ 119.95 <br /> Cableway for ORCHIDCO New cableway $ 366.62 <br /> Div.VI <br /> Michigan River at Walden New staff gage $ 32.34 <br /> White River below N Elk Creek near Buford New radar sensor $ 1,806.02 <br /> Div.VII <br /> Animas River near Howardsville Installation of a bank operated cableway. $ 563.05 <br /> Old Indian Gage bel Red Mesa Reservoir Fix a broken pipe. $ 42.88 <br /> Little Navajo River below Little Oso Diversion Refurbish gage house. $ 139.42 <br /> Outside horizontal cantilever gages JACCUPCO,RIOMOUCO $ 707.21 <br /> Miscellaneous <br /> Misc.supplies and equipment $ 1,404.58 <br /> Moving expense,shelving and new office supplies $ 1,919.17 <br /> TOTAL $ 27,891.49 <br /> • <br />