My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2013
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 8:18:23 AM
Creation date
8/19/2014 8:18:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/26/2013
Description
Finance Committee Meeting September 26, 2013
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Non-Reimbursable Investment Program <br /> Project Data Sheet <br /> • Sponsor: Colorado Water Conservation Board Location: Statewide <br /> Project Name: Satellite-linked Monitoring Project Type: DWR Streamgaging <br /> System and Stream Gage Refurbishment Program <br /> Drainage Basin: Statewide Drainage Basins Water Source: Various <br /> Total Project Cost: $330,000 Funding Source: Construction Fund <br /> CWCB NRI: $330,000 Type of Grantee: State Agency <br /> This project entails the continued, long-term operational viability of the State Satellite Linked <br /> Monitoring System and Stream Gage Refurbishment Program, which is administered by the <br /> Division of Water Resources (DWR). This program currently encompasses 520 satellite stream <br /> gaging stations which require continued replacement of outdated data collection platforms, <br /> upgrades to transmission components, and refurbishment of the associated infrastructure. In <br /> addition, many existing gaging stations need to be modified to provide critical stream flow data <br /> for both flood and low flow monitoring. Changes in technology, which will ultimately increase <br /> reliability and real time data <br /> transmission rates, will require the <br /> . K DWR to continue to upgrade the system <br /> • <br /> in the future. The costs associated with <br /> the continued refurbishment and <br /> . _ { _ t Y` 4 operational viability of the system is <br /> currently approximately $330,000 per <br /> year. <br /> Crystal River DWR/CWCB Satellite Gage <br /> Purgatoire River @ Fishers Crossing <br /> DWR/CWCB Compact Gage <br />
The URL can be used to link to this page
Your browser does not support the video tag.