My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finance Committee Meeting 2013
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Finance Committee Meeting 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 8:18:23 AM
Creation date
8/19/2014 8:18:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/26/2013
Description
Finance Committee Meeting September 26, 2013
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
are, under certain site conditions, being replaced with bank-operated cableways. Costs of installing bank- <br /> operated cableways range from $6000 to $9000 per site. As current funding allows, we have been <br /> addressing some of these needs. <br /> • FY2012-13 Accomplishments <br /> The CWCB provided $300,000 in FY2012-13 for satellite telemetry equipment upgrade and replacement and <br /> stream gage refurbishment. An additional $12,826 in CWCB carryover funds was available from the <br /> previous fiscal year for a total FY2012-13 project budget of$312,826. In total, DWR expended and <br /> committed a total of$311,015, 99.5% of project funding. <br /> Satellite Telemetry Upgrade Program. Of the $245,000 allocated, $245,123 were expended on the <br /> procurement and installation of new generation, high data rate, satellite-linked monitoring equipment and <br /> associated components. High data rate DCP upgrades have now been completed at all DWR gage <br /> stations. However, as discussed earlier, the normal wear, tear and software life cycle anticipates replacing <br /> all equipment every ten years, regardless of other system changes. <br /> Streamgage Refurbishment. An allocation of$55,000 along with carryover funds from the previous fiscal <br /> year in the amount of$12,826 were used to refurbish existing stream gages throughout the State. <br /> Refurbishment projects and miscellaneous expenditures totaling $27,891 were completed at the stream <br /> gages listed in Table 1. An additional $38,000 committed toward the construction of four new gages to help <br /> manage flow alert systems in the West Fork Complex wild fire area were not expended in time to actually be <br /> included in FY2012-13, but will be included in the first quarter report for FY2013-14. <br /> • <br /> 410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.