Laserfiche WebLink
TOWN OF JOHNSTOWN—LONE TREE PIPELINE RECONSTRUCTION PROJECT <br /> P�,' <br /> 1 <br /> Placement of the 16 inch Diameter- Ductile Iron Pipeline <br /> ' Project Description <br /> This $2,700,000 project includes the replacement of 11 miles of open ditch with a 14-16 <br /> inch pipeline from Lonetree Reservoir to the Town of Johnstown's water treatment plant including <br /> a booster station at the reservoir and connection facilities at the treatment plant. PRC <br /> Environmental Management, Inc. of Denver designed the project. The construction contract was <br /> ' awarded to Hall-Irwin Construction Co. (pipeline) of Greeley and B.T. Construction, Inc. (pump <br /> station/electrical) of Broomfield August 6, 1996. Construction commenced in early October 1996 <br /> and was completed in May 1998. Project documentation and final accounting delayed substantial <br /> completion until June 30, 1999. <br /> Project Data <br /> Sponsor: Town of Johnstown County: Larimer/Weld River: Big Thompson River <br /> Terms of Loan: $1,948,932.60 @ 4% for 30 yrs. Substantial Completion Date: June 30,1999 <br /> Design Engineer: PRC Environmental Management, Inc. —Denver, Colorado <br /> ' Construction Contractor: Hall-Irwin Construction, Inc. —Greeley, Colorado <br /> B.T. Construction, Inc. —Broomfield, Colorado <br /> Design Criteria: Length of Pipeline=approx. 11 miles <br /> Pipeline diameter= 14— 16 inch <br /> Pipeline Material=Ductile Iron Pipe <br /> ' Annual Volume of Water Delivered by the Project: 2,200 ac.ft. <br />