My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> ' BUFFALO MUTUAL IRRIGATION CO—DIVERSION STRUCTURE REHABILITATION <br /> • <br /> I <br /> I <br /> ± sf, <br /> , -:F _ <br /> The Ditch Company Officers Operating Their New Headgates <br /> Project Description <br /> ' This $600,000 project was the re-construction of the Buffalo Mutual Irrigation Company's <br /> diversion structure and headgate on the Arkansas River in Prowers County 17 miles east of the City <br /> ' of Lamar. The existing steel and wood dam and headgate had been in place for more than 50 years <br /> and was structurally deficient. Wright Water Engineers of Denver, Colorado completed project <br /> design and preparation of construction contract documents. The construction contract was awarded <br /> 1 to TLM Constructors, Inc. of Swink, Colorado and construction commenced September 21, 1998. <br /> The project was completed in June 1999. <br /> Project Data <br /> ' Sponsor: Buffalo Mutual Irrigation Company County: Prowers River: Arkansas River <br /> Terms of Loan: $453,250 @ 3.75% for 30 yrs. Substantial Completion Date: June 14,1999 <br /> Design Engineer: Wright Water Engineers—Denver, Colorado <br /> ' Construction Contractor: TLM Constructors, Inc.—Swink, Colorado <br /> Design Criteria: Length of Overflow Diversion Structure=200 feet <br /> Diversion Headgate=3 —5 ft. x 6 ft. slide gates <br /> Headgate Flushing Structure= 1 —6 ft. x 4 ft.slide gate <br /> ' Annual Volume of Water Delivered by the Project: 17,560 ac.ft. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.