My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I GREELEY&LOVELAND IRRIGATION CO.—EQUALIZER DAM REHABILITATION <br /> Fk <br /> f { <br /> _ Y <br /> X. I <br /> }fir - _ <br /> t"� .--.. i lam' ,.' <br /> l�l �tea' <br /> I , , , . ,,,.../,,,,,-1-------- ,--A--, <br /> Ir Ij -N T= Y ►t _'" Vi a. .' �: 7 �r'°t <br /> � <br /> ry 4i; �7R ! , �. 1t1 <br /> e <br /> Looking Down/Stream from the Dam at Emergency Spillway/5-Bay Outlet Gate Structure <br /> IProject Description <br /> This $385,000 project was the rehabilitation of the Greeley & Loveland Irrigation <br /> I Company's Equalizer Reservoir located east of Loveland. The project included replacement of the <br /> dam outlet gate with a new structure, which incorporated both the outlet gate and a spillway. The <br /> existing dam embankment was also raised almost four feet. ECI Consultants, Inc. of Englewood <br /> I prepared the construction plans and specifications with the construction contract awarded to <br /> Schmuesor and Associates, Inc. of Wheatridge, CO. Construction commenced on November 16, <br /> 1998, was completed in early March 1999, with Substantial Completion on May 7, 1999. <br /> IProject Data <br /> ISponsor: Greeley&Loveland Irrigation Co. County: Larimer River: Big Thompson River <br /> Terms of Loan: $308,000 @ 4.21% for 30 yrs. Substantial Completion Date: May 7, 1999 <br /> IDesign Engineer: ECI Consultants, Inc. —Englewood, Colorado <br /> IConstruction Contractor: Schmuesor and Associates, Inc.—Wheatridge, Colorado <br /> Design Criteria: Length of Dam Crest=2,600 ft. <br /> I Volume of Reservoir= 1,700 ac.ft. <br /> Outlet Gate=5 —4 ft. x 4 ft. slide gates <br /> 100 - Year Emergency Spillway=20 ft. long x 9 ft. high <br /> ' Annual Volume of Water Delivered by the Project: 885 ac.ft. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.