My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> IWESTERN MUTUAL DITCH CO.—CHECK DAM REHABILITATION PROJECT <br /> I �G' yt� yi�p l� 4 r _,r - <br /> ra.: I W s ^ eye!_•,v <br /> 1 <br /> t arm-- <br /> _ 1 4T, F"'- Ai � <br /> '1�Ia h'-L'LT f lT' <br /> Why �.•;_: - <br /> F <br /> 1 <br /> Looking D/S at the Check Dam Along the Side-Channel West of the Main Channel Diversion <br /> IProject Description <br /> I This project is the construction of a side-channel check dam west of the Western Mutual <br /> Company's main diversion structure on the South Platte River west of Platteville. The <br /> structure is designed to back up side-channel water during low flows, re-directing it toward the <br /> 1 ditch head-gates located on the opposite bank of the river's main channel. The project was <br /> designed by Rocky Mountain Consultants of Longmont, CO. and constructed by Kemp & <br /> Hoffman, Inc. of Northglenn, CO. After a lengthy right-of-way and access dispute with the <br /> I adjacent property owner the project commenced in January 1999 and was completed in March <br /> 1999. <br /> Project Data <br /> ISponsor: Western Mutual Ditch Company County: Weld River: South Platte River <br /> ITerms of Loan:$100,000 @ 3.75% for 20 yrs Substantial Completion Date: Mar. 10,1999 <br /> IDesign Engineer: Rocky Mountain Consultants, Inc. —Longmont, Colorado <br /> Construction Contractor: Kemp &Hoffman, Inc. —Northglenn, Colorado <br /> IDesign Criteria: Length of Check Dam= 120 feet <br /> Height of Check Darn= 7 feet <br /> 1 Type of Dam=Steel Sheet Piling with Treated Timber Flashboards <br /> Annual Volume of Water Delivered by the Project: 20,000 ac.ft. <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.