My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' WAMSLEY CATTLE COMPANY—POLE MOUNTAIN DAM REHABILITATION <br /> . gyp S ._-..�._^---' `s - ... ..r <br /> s4 .� , <br /> \< .F_ ��~� • ^}:_� . �"�- '-y n <br /> ' "� `"" •ti `�i,:r "- - -3... °,'� 4 .sic_ �. _ <br /> Excavation and Grading Work from the Dams Right Abutment <br /> Project Description <br /> This small dam rehabilitation project commenced in March 1994 by the owners of the <br /> Wamsley Cattle Company. The project consisted of replacing the reservoir's outlet structure and <br /> flattening the dam's upstream slope. Smith Geotechnical Engineering (SGE) of Ft. Collins <br /> completed the project design. The project was constructed under the supervision of SGE and the <br /> ' State Engineer's Office by the owner's own forces. The owner completed the work after several <br /> years of effort between ranching, farming and construction. The State Engineer's Office recently <br /> approved the reservoir's filling plan and substantial completion was June 30, 1999. <br /> Project Data <br /> Sponsor: Wamsley Cattle Company County: Jackson River: Off-Stream Drainage <br /> Terms of Loan: $34,036.41 @ 3% for 40 yrs. Substantial Completion Date: June 30,1999 <br /> ' Design Engineer: Smith Geotechnical Engineering—Ft. Collins, Colorado <br /> ' Construction Contractor: Wamsley Cattle Company Owners—Coalmont, Colorado <br /> Design Criteria: Dam Height= 115 feet <br /> 1 Length of Crest=782 feet <br /> Outlet=280 ft. long- 24 inch diameter steel pipe <br /> Ave. U/S slope=4:1 Ave. D/S slope=2.2:1 <br /> ' Annual Volume of Water Delivered by Project:Project: 1,905 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.