My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> HAWKEYE LATERAL DITCH COMPANY-HAWKEYE LATERAL DITCH REHAB. <br /> F.dS.p <br /> I <br /> Delivery of the 36 in. Reinforced Concrete Pipe <br /> Project Description <br /> This $490,000 project was the construction of approximately 13,000 linear feet of PVC <br /> and RCP pipeline, with new headgate and appurtenances, replacing an existing open concrete <br /> lined ditch in poor condition for the Hawkeye Lateral Ditch Company in Mesa County northeast <br /> of Fruita. The Grand Junction Office of the Natural Resource Conservation Service prepared the <br /> project design that was constructed by M. A. Concrete Construction, Inc. of Grand Junction, <br /> Colorado commencing November 7, 1997. Construction was completed in May 1998 with <br /> substantial completion on August 17, 1998. <br /> Project Data <br /> ' <br /> Sponsor: Hawkeye Lateral Ditch Co. County: Mesa River: Colorado via Grand Valley Canal <br /> P Y tY Y <br /> Terms of Loan: $154,113 @ 3.75% for 30 yrs. Substantial Completion Date: Aug. 17,1998 <br /> ' Design Engineer: Natural Resource Conservation Service- Grand Junction, Colorado <br /> Construction Contractor: M.A. Concrete Construction, Inc. - Grand Junction, Colorado <br /> Design Criteria: 1,800 ft. —36 in. dia. reinforced concrete pipe (RCP) <br /> 11,415 ft. —3 in. to 27 in. dia. poly-vinyl-chloride (PVC)pipe <br /> 23 each—6 in. to 12 in. gate valves <br /> Annual Volume of Water Delivered by the Project: 1,260 ac.ft. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.