My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:46:06 AM
Creation date
8/15/2014 9:56:14 AM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> IFARMERS PAWNEE CANAL CO.—DIVERSION STRUCTURE REHABILITATION <br /> ri ie. t .tf e�K: ' <br /> 1 Y'' <br /> *I''I ! <br /> I I <br /> Y <br /> y <br /> ;3 'tom <br /> IPlacement of the Sheet Piling Along the Upstream Face of the Diversion Structure <br /> IProject Description <br /> This project was the rehabilitation of the Farmers Pawnee Canal Company's diversion and <br /> I headgate structure on the South Platte River. The project included the installation of sheet piling <br /> and construction of a concrete toe wall. The project restores damage caused by the July 1997 <br /> Pawnee Creek flood and protects the benefit of irrigation water to about 10,000 acres of cropland. <br /> IThe project was designed by the NRCS, Sterling office and constructed by R&R International, Inc. <br /> of Denver. Construction commenced March 16, 1998 and was completed April 15, 1998. Project <br /> documentation was received for substantial completion on September 23, 1998. <br /> I <br /> Project Data <br /> ISponsor: Farmers Pawnee Canal Company County: Logan River: South Platte River <br /> ITerms of Loan: $22,250 @3.5% for 10 yrs Substantial Completion Date: Sept 23,1998 <br /> Design Engineer: Natural Resource Conservation Service—Sterling, Colorado Office <br /> 1 Construction Contractor: R&R International, Inc. —Denver, Colorado <br /> IDesign Criteria: Length=288 ft Sheet Piling= 5,532 sq.ft. Concrete Toe Wall =44 cu.yd <br /> Annual Volume of Water Delivered by the Project: 28,000 ac.ft. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.