My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:47 AM
Creation date
8/15/2014 9:03:12 AM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> WELDON VALLEY DITCH DIVERSION STRUCTURE REHABILITATION <br /> I <br /> I <br /> I <br /> ei �5a <br /> ' -._ ;z <br /> 't. F•' .- : F- <br /> 1 _ <br /> The Diversion Structure Control House on the South Bank of the South Platte River <br /> IProject Description <br /> I This $250,000 project was the re-construction of the Weldon Valley Ditch Diversion <br /> Structure on the South Platte River in Weld County west of the Town of Orchard. Jack Odor <br /> Engineering Services, Inc. of Fort Morgan, Colorado, completed project design. Project <br /> I construction commenced by Ransom Boone Construction, Inc. of Fort Morgan October 21, 1997 <br /> and was completed in January 1998. Final project accounting and documentation was completed in <br /> February 1998. <br /> IProject Data <br /> ISponsor: Weldon Valley Ditch Company County: Weld River: South Platte River <br /> Terms of Loan: $181,888.64 @ 3.5%for 20 yrs. Substantial Completion Date: Feb. 20, 1998 <br /> IDesign Engineer: Jack Odor Engineering Services,Inc.—Fort Morgan, Colorado <br /> IConstruction Contractor: Ransom Boone Construction,Inc.—Fort Morgan, Colorado <br /> Design Criteria: 1 —5 ft high x 60 ft. long Obermeyer pneumatic spillway crest gate <br /> I1 -8 ft. steel radial release gate <br /> Ditch Capacity= 165 cfs <br /> Annual Volume of Water Delivered by the Project: 1,000 ac.ft. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.