My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:47 AM
Creation date
8/15/2014 9:03:12 AM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I <br /> UPPER YAMPA WATER CONSERVANCY DISTRICT—STAGECOACH RESERVOIR REFINANCE <br /> I <br /> I <br /> I <br /> A <br /> s <br /> I <br /> ►:4,3 .tom UR o.---::•. :- -- '--,t 1- --14.-C :- ---;.1-- ...V ::: --.= * ..---4: ' L.,-; - <br /> a s .� * 'A' <br /> .4. <br /> IProject Description <br /> Stagecoach Dam and Reservoir is located about 16 miles south of Steamboat Springs on the Yampa <br /> I River in Routt County. The reservoir, constructed in 1987-1989, provides water for agricultural, <br /> municipal, industrial, and recreational purposes in the upper Yampa River Valley. An 800-kilowatt <br /> hydropower plant is an integral part of the project. In addition,the project includes extensive public <br /> Irecreational facilities as well as 80 acres of dedicated wetlands and 640 acres of wildlife habitat. The <br /> original cost of the project was $17,500,000 financed in part through a loan from the USBR and a <br /> I CWCB loan of $7,900,000 at 5.0 %for 40 years. In 1996,the District applied to the CWCB for an <br /> additional loan to help pay off their USBR loan. <br /> IProject Data <br /> Sponsor: Upper Yampa Water Conservancy District County: Routt River: Yampa <br /> ITerms of Loan: $2,000,000 at 4.5% for 20 years Substantial Completion Date: July 30, 1997 <br /> I Design Criteria: The reservoir has a total capacity of about 33,000 acre-feet and the dam is a <br /> 145-foot high roller compacted concrete structure. <br /> IVolume of Water Delivered by the Project: Project water supply is allocated as follows: <br /> agriculture 4,000 acre-feet, municipal and industrial 2,000 acre-feet, power generation 9,000 <br /> acre-feet,recreation 15,000 acre-feet, and a permanent pool of 3,000 acre-feet. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.