Laserfiche WebLink
I .. <br /> I <br /> ISANCHEZ DITCH&RESERVOIR CO-SANCHEZ DAM OUTLET REHABILITATION <br /> 1 <br /> \ te- <br /> I G . <br /> 1 <br /> I <br /> I <br /> I la <br /> ILooking Down Into the 135 foot High Outlet Tower <br /> Project Description <br /> IThis dam outlet rehabilitation project for the Sanchez Dam was designed by Smith <br /> Geotechnical Engineers from Ft. Collins. The project included the replacement of the outlet <br /> structures gates, valves and appurtenances in very difficult underwater construction conditions. <br /> I Construction commenced in February 1997 by a special construction staff hired by the Sanchez <br /> Ditch and Reservoir Company. The staff was hired in order to reduce project costs and take <br /> advantage of specialized construction skills necessary for successful project completion. The <br /> I project was completed in late July 1997 with financial contract requirements completed in <br /> September. <br /> IProject Data <br /> Sponsor: Sanchez Ditch and Reservoir Co. County: Costilla River: Ventero Creek <br /> 1 Terms of Loan: $335,000 @ 3.75%for 25 yrs. Substantial Completion Date: Sept. 3, 1997 <br /> Design Engineer: Smith Geotechnical Engineers,Inc. -Ft. Collins, Colorado <br /> I -Construction Contractor: Scott Holman and Associates - Southfork, Colorado <br /> I Design Criteria: 3 -New 30 in.Hydraulic Knife Gate Valves <br /> 2 -New 48 in. Hydraulic Wedge Gate Valves <br /> 1 -New 48 in. Fixed Cone Valve <br /> 3 -Existing 30 in. Wedge Gates -Replace Mechanical Operators and Stems <br /> IAnnual Volume of Water Delivered by the Project: 20,000 ac.ft. <br /> I <br />