My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:47 AM
Creation date
8/15/2014 9:03:12 AM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> I <br /> ' DECKER LATERAL DITCH CO. - DECKER LATERAL DITCH REHABILITATION <br /> I <br /> 1 � <br /> i t <br /> r y i <br /> ' Looking North Along the Concrete-Lined Decker Lateral Ditch and Ditch Access Road <br /> Project Description <br /> This $145,000 project is the concrete lining of approximately 8,800 feet of an existing open <br /> channel irrigation ditch in Weld County northeast of Greeley. The Greeley Office of the Natural <br /> ' Resource Conservation Service prepared the project design. The construction contract was <br /> awarded to CG&S Company, Inc. of Greeley, Colorado November 5, 1997. Project construction <br /> commenced November 18, 1997 and was substantially completed May 22, 1998. <br /> Project Data <br /> ' Sponsor: Decker Lateral Ditch Company County: Weld River: Owl Creek <br /> Terms of Loan: $100,000 @ 4.25% for 30 yrs Substantial Completion Date: May 22,1998 <br /> Design Engineer: Natural Resource Conservation Service-Greeley Office <br /> Construction Contractor: CG&S Company,Inc.-Greeley, Colorado <br /> Design Criteria: Concrete Lined Trapezoidal Ditch: <br /> ' Length=8,800 feet <br /> Depth=40 in.- 16 in. Bottom Width=2 feet- 1 foot <br /> Design Discharge=33 cfs- 14 cfs Concrete Turnout Division Boxes=5 <br /> ' Annual Volume of Water Delivered by the Project: 17,560 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.