My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:47 AM
Creation date
8/15/2014 9:03:12 AM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> I <br /> BEAVER RESERVOIR COMPANY—BEAVER RESERVOIR DAM REHABILITATION <br /> } <br /> I ! <br /> I - - - --°-a ,7-- <br /> - _ <br /> 1y �, <br /> - f K . .� <br /> -=';_ ->-.-"----"''.-1-e-. ',, - <br /> l <br /> /,.. ;i ' , :. ;, ,, <br /> I <br /> I - <br /> Placement of the High Density Polyethylene Geo-membrane Liner on the Left Abutment <br /> IProject Description <br /> I This project was the rehabilitation of the Beaver Reservoir Dam southeast of Paonia <br /> along the East Fork Minnesota Creek. The project consisted of overexcavating and backfilling <br /> several sinkholes along the upstream dam face and abutments, and recontouring the upstream <br /> jI abutments to reduce their grade. A 60 mil high density polyethylene geo-membrane liner was <br /> placed over the upstream dam face and abutments and covered with 2 feet of basin material to <br /> seal the repairs. Minors repairs were also made to the hydraulic outlet gate. Construction <br /> Icommenced in September 1996, and after several weather and labor related delays was <br /> completed November 1, 1997. <br /> IProject Data <br /> Sponsor: Beaver Reservoir Company County: Gunnison River: E. Fork Minnesota Ck. <br /> ITerms of Loan: $373,000 @ 3%for 40 yrs. Substantial Completion Date: Nov. 1, 1997 <br /> IDesign Engineer: Golder and Associates, Inc.—Lakewood, Colorado <br /> Construction Contractor: Farnsworth Construction Company,Inc.—Paonia, Colorado <br /> IDesign Criteria: 220,000 sq.ft. - 60 mil. high density polyethylene geo-membrane liner <br /> 18,000 cu.yd. - excavation and backfill subgrade material <br /> IAnnual Volume of Water Delivered by the Project: 225 ac.ft. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.