My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
CWCB
>
Publications
>
DayForward
>
CWCB Construction Fund and Severance Tax Trust Fund Annual Report 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 11:45:47 AM
Creation date
8/15/2014 9:03:12 AM
Metadata
Fields
Template:
Publications
Year
1998
Title
Construction Fund and Severance Fund Tax Trust Fund Annual Report
CWCB Section
Agency-wide
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXCELSIOR IRRIGATING CO.-DIVERSION STRUCTURE REHABILITATION <br /> 1 �, <br /> .,,,fit< <br /> 4A4 J e�elti.'l 04 <br /> I.M <br /> t'171 <br /> ;� <br /> 1 <br /> t <br /> I <br /> Excelsior Ditch Diversion Intake Structure from the Arkansas River <br /> Project Description <br /> This project is the rehabilitation of the Excelsior Ditch including the re-construction of their <br /> Arkansas River diversion structure, the rehabilitation of a wastegate/diversion structure along <br /> Excelsior Ditch, and the reshaping and regrading of the delivery ditch. The project was designed <br /> by Ralph Adkins, P.E. of Pueblo with review by the Natural Resource Conservation Service, <br /> Pueblo office. Construction commenced in March by Evans Construction Company of Pueblo, and <br /> was completed in August 1997. <br /> Project Data <br /> Sponsor: Excelsior Irrigating Company County: Pueblo River: Arkansas River <br /> Terms of Loan: $100,000 @ 3.75%for 30 yrs. Substantial Completion Date:Aug. 21, 1997 <br /> ' Design Engineer: Ralph Adkins,P.E. -Pueblo, Colorado <br /> Construction Contractor: Evans Construction Company, Inc. -Pueblo, Colorado <br /> ' Design Criteria: 12 ft. Radial Control Gate(at Arkansas diversion intake) <br /> 48 in. dia. Float Control Well(at wastegate diversion) <br /> 4fI. x 6ft. Screw Gate(at wastegate diversion) <br /> ' Annual Volume of Water Delivered by the Project: 4,248 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.