Laserfiche WebLink
I <br /> 1 2.8 Small Project Loan Account <br /> IIn 1994 through SB94-029,the General Assembly created the Small Project Loan Account. A <br /> total of$2.0 million was set aside for loans of$100,000 or less. The CWCB was empowered to <br /> I authorize these loans at any time during the year without waiting to submit these projects for General <br /> Assembly approval during the legislative session. <br /> I There were five loans totaling$281,700 from the Small Project Account approved by the Board <br /> in FY95-96. However,the total amount actually under contract,or$210,000, was less than the total <br /> amount approved by the Board. A balance of$1,875,000 was reported by COFRS to be in the <br /> Iaccount on June 30, 1996. <br /> Two additional projects have been approved by the Board in the first half of FY96-97, so as of <br /> 1 January 1, 1997, $1,590,000 was available in the account. <br /> I Date Approved Contract <br /> Approved Borrower/Emergency County Amount Amount <br /> I Jul 1995 Caryl R.Carroll- Rio Blanco $25,000 $ 25,000 <br /> D&D Wise Dam Rehab.(Additional) <br /> I Jan 1996 The Pagosa Springs Pipeline Co.- Archuleta 60,000 0 <br /> Raw Geothermal Water Pipeline <br /> Jan 1996 South Platte Ditch Company- Logan 100,000 100,000 <br /> 1 Diversion Structure Rehabilitation <br /> Mar 1996 Bravo Ditch Company- Logan 51,700 40,000 <br /> IDiversion Structure Rehabilitation <br /> May 1996 Tremont Mutual Ditch Company- Morgan 45,000 45,000 <br /> I Diversion Structure Rehabilitation <br /> Sep 1996 Decker Lateral Company- Weld 100,000 100,000 <br /> Decker Lateral Lining Project <br /> INov 1996 Excelsior Irrigating Company- Pueblo 100,000 100,000 <br /> Ditch Rehabilitation --- <br /> 1 Totals $481,700 $410,000 <br /> 1 <br /> I <br /> I <br /> 1 CWCB FY96 Annual Report,page 11 <br />