My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150464 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150464 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 1:09:24 PM
Creation date
5/29/2014 1:09:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150464
Contractor Name
Fort Morgan Irrigation Company & Groves farms
Contract Type
Grant
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Civil Design Group (CDG) will finalize design for pipeline and related appurtenances,receive <br /> and evaluate proposals,and provide construction oversight during construction. <br /> • Major deliverables will include pipeline, intake structure, metering devices, valves and <br /> appurtenances to make the pipeline 100%operational. <br /> Task 2 - Pumps <br /> • Pumps--- Install pumps (2), electrical controls, and related appurtenances to pump water from <br /> the South Platte River to the Groves Ponds and additional Ponds along the pipeline route. <br /> • Civil Design Group (CDG) will finalize design for pumping equipment, electrical controls and <br /> related appurtenances, receive and evaluate proposals, and provide construction oversight <br /> during installation and testing of pump equipment. <br /> • Major deliverables will include pumps and electrical controls. <br /> Task 3-Well and Well Pump <br /> • Well & Well Pump - Install one water well and pumping equipment near the Groves Ponds. <br /> electrical controls, flow meter, and related appurtenances to pump ground water from the South <br /> Platte alluvium near the Groves Ponds through the pipeline to the South Platte River. <br /> • 7 LA Water Engineers, Inc. (ILA) will design the well and pumping equipment, electrical <br /> controls and related appurtenances, receive and evaluate proposals, and provide construction <br /> oversight during installation and testing of the water well and associated pump equipment. <br /> • Major deliverables will include a water well, pump equipment,and electrical controls. <br /> Task 4-Wetlands and Ponds <br /> • Wetlands and Ponds - Install / rehabilitate seven (7) pond structures that will be designed to <br /> optimize recharge.augmentation supply,and waterfowl habitat. <br /> • f/A Water Engineers. Inc. (ILA) will design the pond structures and oversee construction <br /> activities. <br /> • Major deliverables will include 7 pond structures with a total surface area of approximately 95 <br /> acres. <br /> IL Personnel <br /> Civil Design Group-Leroy'Nobler, P.E.-Pipeline and pump equipment design. <br /> TZA Water Engineers-- Bruce Kroeker P.E. and Tom Dea, RE. - Water well, well pump, and pond <br /> design. <br /> .IB Wright and Associates-James Wright, P.E.- Final Survey. <br /> Ducks Unlimited-wetland consultation and assistance. <br /> III. Bucket <br /> A detailed budget by task, which includes the level of effort(hours)and rates - See Attachment 1 at <br /> the end of this application. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.