My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150464 Application
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150464 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 1:09:24 PM
Creation date
5/29/2014 1:09:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150464
Contractor Name
Fort Morgan Irrigation Company & Groves farms
Contract Type
Grant
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. Schedule <br /> After the date of final approval of both the grant and loan financing, we anticipate the schedule to <br /> be as follows: <br /> Final design to be completed within 90 days <br /> Pipeline Construction - 150-200 days <br /> Pump Equipment Installation and Testing-90 days <br /> Well and Pump Installation -60 days <br /> Wetlands and Pond Construction- 100 days <br /> Final Survey 220 days <br /> Some of these items would be done simultaneously. The bottom line is a total construction period <br /> of approximately 220 days, plus 90 days for final design. So. the project can be completed within <br /> the next 12-18 months. <br /> NOTE: Costs incurred prior to execution of a contract or purchase order are not <br /> subject to reimbursement. <br /> 6. Water Availability and Sustainability -- this information is needed to assess the viability and <br /> effectiveness of the water project or activity. Please provide a description of each water supply <br /> source to be utilized for, or the water body to be affected by, the water activity. For water supply <br /> sources being utilized, describe its location, yield, extent of development, and water right status. <br /> For water bodies being affected, describe its location, extent of development, and the expected <br /> effect of the water activity on the water body, in either case, the analysis should take into <br /> consideration a reasonable range of hydrologic variation. <br /> A. FMRICo has decreed water rights from the South Platte River. as well as pending <br /> applications for conditional water rights, that will provide the sources for its share of this project. These <br /> rights are all decreed for augmentation use and have been diverted at times in the past when in priority to <br /> generate augmentation credits for the augmentation plan. these rights, and the structures that they <br /> utilize, include: <br /> I._._Water Rights Decreed in Case No. W 2692 Water Division I_ the W-2692 Decree allows <br /> FM RICo to use recharge credit in excess of the depletions attributable to the operation of the wells <br /> included in the augmentation plan decreed therein. The water rights identified in the W-2692 Decree that <br /> can be used for augmentation purposes are generally described as follows: <br /> WATER RIGI IT AMOUNT DECREE LOCATION <br /> NAMI'. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.