My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150396 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150396 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 3:34:05 PM
Creation date
5/27/2014 3:48:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-140
C150396
Contractor Name
Northern Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Executive Summary <br /> Date: April 1, 2014 <br /> Applicant: Carl Brouwer, Project Manager <br /> Northern Colorado Water Conservancy District <br /> 220 Water Avenue, Berthoud, CO 80513 <br /> Project Location: Grand County, Colorado <br /> Project Summary: Northern Colorado Water Conservancy District acting through its Hydropower <br /> Enterprise is requesting loan of$5,408,000 for construction of the 1.2 Megawatt Granby Hydro Project. <br /> This project will be located at the existing Colorado-Big Thompson Project Granby Dam and will utilize <br /> the existing releases to the Colorado River. The facility will include two 600 kilowatt Francis turbines. <br /> The project will generate 5,000,000 kilowatt-hours of clean renewable energy which will be integrated <br /> into the local Mountain Parks Electric Inc. power delivery system. <br /> Estimated Completion Date: May 2016 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.