Table of Contents <br /> Executive Summary 1 <br /> Northern Water Description 2 <br /> LOPP Process 3 <br /> Project Description 3 <br /> Hydrology 3 <br /> Alternative Analysis 5 <br /> Project Components 5 <br /> Energy Generation 8 <br /> Project Cost 9 <br /> Financial Plan 10 <br /> Cash Flow 10 <br /> Collateral 14 <br /> Schedule 14 <br /> Opinion of Feasibility Study 14 <br /> FIGURES <br /> Figure 1 - C-BT Facilities and Northern Water Boundaries 2 <br /> Figure 2—Flow Duration Curve for Granby Dam 4 <br /> Figure 3 - Head Duration Curve 4 <br /> Figure 4 - Project Site Plan 6 <br /> Figure 5-Power House Plan View 7 <br /> Figure 6-Power House Profile View 7 <br /> Figure 7 Annual Energy Production 8 <br /> Figure 8-Monthly Distribution of Energy Production 8 <br /> Figure 9- Project Schedule 14 <br /> TABLES <br /> Table 1 - Flow Release Schedule for Granby Dam 3 <br /> Table 2 - Project Cost Estimate 9 <br /> Table 3 - Project Finance Summary 11 <br /> Table 4 - Financial Analysis—Planning Scenario 12 <br /> Table 5-Financial Analysis—Probable Scenario 13 <br /> ATTACHMENTS <br /> Feasibility Design Report—Granby Hydropower Project, CH2MHill <br /> Granby Hydropower Project— Updated Power Plant Location and Arrangement Drawings <br />