My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153642 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153642 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:51:51 AM
Creation date
3/5/2014 9:20:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153642
Contractor Name
Colorado River Water Conservation District
Contract Type
MOU
County
Garfield
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work <br /> compliance requirements for the lead agency and other federal agencies. Include a listing of all <br /> required activities through issuance of the Final EIS. <br /> Sub-task 7C. Outline and Schedule for Permitting Activities <br /> Based on the results of Sub-tasks 7A and 7B, prepare a scope and schedule for federal, <br /> state and local permitting activities necessary to support enlargement of Elkhead Reservoir. <br /> Include required activities through completion of dam construction and tilling of reservoir. <br /> Sub-task 7D. Meetings <br /> Prepare for, participate in. and document discussions of meetings necessary to carry out <br /> Task 7 up to a total of 64 man-hours. <br /> Sub-task 7E. Task Memo <br /> • <br /> Prepare a summary memorandum describing activities and findings of Task 7 for review <br /> by the study TSG. <br /> TASK 8: PRELIMINARY BIOLOGICAL ASSESSMENT <br /> The objective of this task is to develop a preliminary Biological Assessment for use in <br /> preliminary consultation regarding the roposed project under Section 7 of the Endangered <br /> Species Act. The task will utilize data and analyses developed in other Tasks to produce a <br /> document for submission to the USFWS for its review and preparation of a preliminary <br /> Biological Opinion. The document will permit the USFWS to provide specific guidance as to <br /> studies that will be required for preparation of the final Biological Assessment and Opinion. <br /> Sub-task 8A. Project Description <br /> Based on existing data and information generated in other Tasks, prepare a description <br /> of the proposed project facilities and operation. <br /> Sub-task 8B. List Endangered Species and Critical Habitat <br /> Based on existing information. on field inspection of the reservoir area. and information <br /> provided by the USFWS. prepare a listing of all Endangered Species and a description of all <br /> Designated or Proposed Critical Habitat likely to be affected by the proposed project. <br /> Sub-task 8C. Environmental Baseline Flows <br /> Using the basin computer model developed in the preceding Alternatives Feasibility <br /> Study and information from the most recent Yampa River basin Section 7 consultations <br /> provided by the USFWS. prepare an estimate of monthly Environmental Baseline tiow <br /> conditions encompassing water years 1930-82 in selected mainstem reaches between Hayden <br /> and Deerlodge Park paying particular attention to reaches identified as being critical habitat <br /> and reaches for which specific Flow Recommendations have been made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.