My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153642 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153642 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:51:51 AM
Creation date
3/5/2014 9:20:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153642
Contractor Name
Colorado River Water Conservation District
Contract Type
MOU
County
Garfield
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work <br /> Sub-task 8D. Analysis of On-site Impacts <br /> Utilizing existing information and the results of Sub-task 8B, prepare an analysis of the <br /> probable impacts of the proposed project on endangered species and critical habitats found in <br /> the project area. <br /> Sub-task 8E. Operational Impacts on F&WS Flow Recommendations <br /> Using the basin computer model, prepare descriptions of the effects on Environmental <br /> Baseline flows of Sub-task 8C of operation of the proposed project. <br /> Sub-task 8F. Analysis of Water Quality Impacts <br /> Using existing information and the results of the model operations studies of Sub-task <br /> 8E, prepare a description of changes in water quality that are likely to occur with development <br /> and operation of the proposed project. Include discussion of likely changes in sediment and <br /> water temperature. <br /> Sub-task 8G. Sport Fishery Management Plan <br /> Describe the proposed methods for management of the sport fishery aspects of the <br /> proposed project. Include discussion of species to be introduced, their potential for <br /> competition with and predation upon the endangered fishes, and methods of minimizing or <br /> eliminating such competition or predation. <br /> Sub-task 8H. Reasonable and Prudent Alternatives <br /> Develop conceptual descriptions of reasonable and prudent alternatives designed to offset <br /> potential impacts on the endangered species of the proposed project and document benefits of <br /> the proposed actions that may not be provided by these reasonable and prudent alternatives. <br /> Sub-task 81. Meetings <br /> Prepare for, participate in, and document discussions of meetings necessary to carry out <br /> Task 8 up to a total of 80 man-hours. <br /> Sub-task 8J. Task Memo <br /> Prepare a summary memorandum describing activities and findings of Task 8 and results <br /> of preliminary Section 7 consultation for review by the study TSG. <br /> TASK 9: DEVELOPMENT PLAN <br /> The objective of this task is to prepare a more detailed development schedule and <br /> financial plan for the proposed project. This task will provide refined cost estimates and <br /> financing requirements and will form the basis for negotiations regarding cost-sharing and <br /> financing strategy. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.