Laserfiche WebLink
TABLE 6 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />RALSTON CREEK SIPHON: OUTLET STRUCTURE <br />ENGINEER'S OPINION OF COSTS <br />Construction Item <br />Mobilization, Bonding, Insurance @ 5°/o <br />Clear and Grub <br />Demolition <br />Dewatering <br />Earthwork <br />Concrete <br />Saftey Rails <br />Sub-base <br />Riprap <br />Quantity <br />1 <br />1 <br />1 <br />1 <br />1 <br />50 <br />1 <br />20 <br />37 <br />Unit <br />LS <br />LS <br />LS <br />LS <br />LS <br />CY <br />LS <br />CY <br />CY <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Cost <br />3,000.00 $ <br />1,000.00 $ <br />5,200.00 $ <br />5,000.00 $ <br />3,700.00 $ <br />600.00 $ <br />3,500.00 $ <br />25.00 $ <br />50.00 $ <br />Total Construction Items $ <br />Contingency @ 20% $ <br />Engineering @ 15% $ <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ <br />Extension <br />3,000.00 <br />1,000.00 <br />5,200.00 <br />5,000.00 <br />3,700.00 <br />30,000.00 <br />3,500.00 <br />500.00 <br />1,850.00 <br />53, 750.00 <br />11,000.00 <br />8,000.00 <br />73,000.00 <br />