Laserfiche WebLink
TABLE 7 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />BURLINGTON NORTHERN RAILROAD SIPHON: EROSION CONTROL <br />ENGINEER'S OPINION OF COSTS <br />Construction Item Quantity Unit Cost Extension <br />Mobilization, Bonding, Insurance @ 5°/o 1 LS $ 300.00 $ 300.00 <br />Clear and Grub 1 LS $ 750.00 $ 750.00 <br />Riprap 35 CY $ 50.00 $ 1,750.00 <br />Concrete 5 CY $ 600.00 $ 3,000.00 <br />Total Construction Items $ 5,800.00 <br />Contingency @ 20% $ 1,000.00 <br />Engineering @ 15% $ 1,000.00 <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ 8,000.00 <br />