My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150314 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150314 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 12:06:41 PM
Creation date
3/5/2014 9:05:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-019
C150314
Contractor Name
Farmers High Line Canal and Reservoir Company
Contract Type
Loan
Water District
7
County
Adams
Jefferson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 7 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />BURLINGTON NORTHERN RAILROAD SIPHON: EROSION CONTROL <br />ENGINEER'S OPINION OF COSTS <br />Construction Item Quantity Unit Cost Extension <br />Mobilization, Bonding, Insurance @ 5°/o 1 LS $ 300.00 $ 300.00 <br />Clear and Grub 1 LS $ 750.00 $ 750.00 <br />Riprap 35 CY $ 50.00 $ 1,750.00 <br />Concrete 5 CY $ 600.00 $ 3,000.00 <br />Total Construction Items $ 5,800.00 <br />Contingency @ 20% $ 1,000.00 <br />Engineering @ 15% $ 1,000.00 <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ 8,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.