Laserfiche WebLink
TABLE 5 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />VAN BIBBER CREEK SIPHON: SHOTCRETE OPTION <br />ENGINEER'S OPINION OF COSTS <br />Construction Item <br />Mobilization, Bonding, Insurance @ 5% <br />Clear and Grub <br />Dewatering <br />Shotcrete Inlet <br />Shotcrete Outlet <br />Shotcrete Box Culvert <br />Bar Grate <br />Safety Rails <br />Quantity <br />1 <br />1 <br />1 <br />21 <br />20 <br />33 <br />1 <br />1 <br />Unit <br />LS <br />LS <br />LS <br />CY <br />CY <br />CY <br />LS <br />LS <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Cost <br />4,000.00 $ <br />1,000.00 $ <br />3,000.00 $ <br />800.00 $ <br />800.00 $ <br />800.00 $ <br />7,500.00 $ <br />9,500.00 $ <br />Total Construction Items $ <br />Contingency @ 20% $ <br />Engineering @ 15% $ <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ <br />Extension <br />4,000.00 <br />1,000.00 <br />3,000.00 <br />16,800.00 <br />16,000.00 <br />26,400.00 <br />7,500.00 <br />9,500.00 <br />84,200.00 <br />17,000.00 <br />13,000.00 <br />114,000.00 <br />