Laserfiche WebLink
TABLE 2 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />MASTER PLAN <br />COSTS OF PREVIOUS WORK <br />Construction Item Quantity Unit Cost Extension <br />Mobilization, Bonding, Insurance @ 5°/o 1 LS $ - $ - <br />Total Construction Items $ - <br />Contingency @ 20% $ - <br />Engineering $ 109,034.00 <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ 109,000.00 <br />