Laserfiche WebLink
TABLE 3 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />CLUB CREEK STORM DRAIN CROSSING <br />COST OF PREVIOUS WORK <br />Construction Costs <br />Engineering Costs <br />$ 59,613.40 <br />$ 6,878.00 <br />Total Cost $ 66,491.40 <br />