Laserfiche WebLink
TABLE 1 <br />FARMERS' HIGH LINE CANAL FEASIBILITY STUDY <br />CANAL EVALUATION <br />COSTS OF PREVIOUS WORK <br />Construction Item Quantity Unit Cost <br />Mobilization, Bonding, Insurance @ 5°/o 1 LS $ - $ <br />Total Construction Items $ <br />Contingency @ 20% $ <br />Engineering $ <br />ESTIMATED TOTAL (rounded to nearest $1,000) $ <br />Extension <br />29,693.49 <br />30,000.00 <br />