My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150318 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150318 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 11:07:13 AM
Creation date
2/26/2014 11:40:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150318
Contractor Name
Last Chance Ditch Company
Contract Type
Loan
Water District
5
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Demolition <br />Earthwork <br />Cofferdam <br />Dewaterinc <br />Rip Rap <br />Reinforced <br />Concrete <br />Reinforced <br />Concrete <br />Reinforced <br />Concrete <br />Winter <br />protection <br />Headgate <br />Overshot q <br />Footers <br />Vertical <br />Flatwork <br />48" x 48" <br />18' x 5' <br />Last Chance Ditch Company <br />�TY Unit <br />1 ea <br />1 ea <br />240 sf <br />120 da s <br />237 sy <br />37 CY <br />33 CY <br />38 CY <br />4 msf <br />2 ea <br />1 ea <br />Location <br />iustment <br />Unit Cost <br />$ 4, 500.00 <br />$ 8, 500.00 <br />$ 23.00 <br />$ 63.40 <br />$ 84.00 <br />94.6% <br />Unit cost W/ <br />location adius <br />$ 4, 500.00 <br />$ 8,500.00 <br />$ 23.00 <br />$ 59.98 <br />$ 79.46 <br />$ 300.00 $ <br />$ 300.00 $ <br />$ 180.00 $ <br />$ 234.00 $ <br />$ 4, 794.00 $ <br />$36,104.00 $ <br />Total <br />$ 4,500.00 <br />$ 8,500.00 <br />$ 5,520.00 <br />$ 7,197.17 <br />$ 18,832.97 <br />$ 44,550.14 <br />283.80 $ 10,500.60 <br />283.80 $ 9,365.40 <br />170.28 I $ 6,470.64 <br />221.36 $ 885.46 <br />4,794.00 $ 9,588.00 <br />36,104.00 $ 36,104.00 <br />$ 72,914.10 <br />$117,464.23 <br />The above cost estimate includes the overshot gate; Last Chance Ditch <br />Company may elect to add it at a future date. If the overshot gate is added at a <br />later date there �vill be additional costs involved with temporarily closing the <br />overshot gate opening. <br />Obtaining Bids <br />After the completion of the Head�vorks Construction Speciiications plan by <br />AGPRO, Last Chance requested bids for the proposed work. Bid costs ranged <br />from approximately $170,000 to $190,000. The difference in AGPRO's opinion <br />of probable cost and the bid costs can be attributed to the increase in material <br />costs, especially metal in the past few years as well as construction overruns. <br />Last Chance is requesting additional funds as a contingency plan in the event <br />of further material cost inflation, overruns and in case there are any <br />unforeseen problems during construction. If the additional funds are not <br />needed they will be repaid upon completion of the project. <br />I ast ance itc ompany oan easi i ity tu y age o <br />
The URL can be used to link to this page
Your browser does not support the video tag.