Laserfiche WebLink
Table 1— Opinion of Probable Cost <br />Item 1— General Work (Including Mobilization and Bonds) <br />Item 2 — Site Access <br />Item 3— Erosion and Sediment Controls <br />Item 4— Clearing, Grubbing and Stripping <br />Item 5 — Excavation Dewatering <br />Item 6 — Demolition <br />Item 7— Embankment Foundation Excavation <br />Item 8— Zoned Embankment Construction <br />Item 9— Low Level Outlet Works <br />Item 10 — Service Spillway <br />Item 11 — Emergency Spillway <br />Item 12 — Reservoir Fill Line <br />Item 13 — Wetlands and Reclamation <br />Item 14 — Reservoir Excavation <br />Item 15 — Miscellaneous Items <br />$398,423 <br />$19,820 <br />$12,210 <br />$37,531 <br />$22,000 <br />$15,621 <br />$132,000 <br />$919,269 <br />$86,441 <br />$4,400 <br />$127,299 <br />$26,783 <br />$16,522 <br />$559,020 <br />$13,200 <br />Sub Total $2,390,538 <br />15% Construction Contingency $358,581 <br />Construction Sub Total $2,749,119 <br />Construction Phase Engineering (15%) <br />$412,368 <br />Total Construction Costs, Including Engineerinq $3,161,487 <br />CWCB Loan Amount (90% funding) <br />$2,845,338 <br />Economic Analysis and Benefits and Costs <br />The District's current rate and fee schedule, the 2010 unaudited financial statement <br />through December 15, 2010 and the 2007, 2008, and 2009 audited financial statements <br />are included in Appendix E. The purpose of the project is to improve system reliability. <br />Since the local economy is resort based, a failure of the District's water supply system <br />would have a significant negative impact on the local economy. <br />_� w. w Ulheeler and Associatas. inc. Feasibility of Enlargment of Ziegler Reservoir <br />� Ulater R¢sources Engin¢ers Page 10 <br />