Laserfiche WebLink
Water Quality Issues <br />There will be no adverse water quality issues to address as construction will not impact <br />any streams, nor will there be any new water supplies developed as a part of this project <br />for which water quality concerns would need to be addressed. The junior water rights will <br />only be diverted during such times as when there is sufficient water present in the <br />system so that there are no senior calls on the stream. At these times of high flow there <br />should not be significant water quality issues associated with the diverted water. <br />Field Investigations <br />Five soil investigations of the reservoir site have been completed. The first four were <br />investigations of the subsurface conditions at the reservoir for preliminary design and <br />feasibility studies. The latest investigation was performed by URS Corporation in 2010 <br />including final geotechnical engineering analyses for the final design of the Ziegler <br />Reservoir Enlargement project. Initial excavation of the enlarged dam footprint and <br />some excavation of the reservoir area have been completed in the fall of 2010. <br />�,a u�. W Ulheeler nnd puvciates, Inc. Feasibility of Enlargment of Ziegler Reservoir <br />�'1 O1JaCar Rasaur¢�s frtgin�acrs Page 5 <br />