My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION II <br />PROJECT SPONSOR <br />The Snowmass Water and Sanitation District is a Colorado Special District, created in <br />1964. As a quasi-municipal entity, the District primarily derives income from property <br />taxes, service fees, and system development fees. <br />The District boundaries, diversion points and project location are shown on Figure No. 1 <br />in Appendix A. The District services a population equivalent of approximately 3,500 <br />year-round residents. Due to the area's resort based economy, the demand for water <br />varies significantly throughout the year as the District's population occasionally soars to <br />over 16,000 during the ski season. <br />District water facilities include three diversion locations, a 5.2 MGD water treatment <br />plant, 12 potable water storage tanks, and approximately 44 miles of distribution <br />pipelines. <br />�,a u�. W Ulheeler nnd puvciates, Inc. Feasibility of Enlargment of Ziegler Reservoir <br />�'1 O1JaCar Rasaur¢�s fngin��rs Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.