My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION I <br />STUDY INTRODUCTION AND OBJECTIVES <br />The Snowmass Water and Sanitation District (District) provides potable water service for <br />customers within the District boundaries, which include the Town of Snowmass Village. <br />The District diverts water for treatment from East Snowmass Creek, Brush Creek, and <br />Snowmass Creek. The District presently does not have a useable raw reserve water <br />storage facility, but purchased Ziegler Reservoir (aka Lake Deborah) in 2008 for the <br />express purpose of improving system reliability and providing reserve supply by <br />expanding the reservoir from its current 57 AF to approximately 225 AF. To regulate <br />flows and provide a supply during times of diminished stream flows, a system to divert <br />water to and pump water from the reservoir was built in 2009. The District initiated the <br />Ziegler Reservoir enlargement project (project) in 2010 and proposes to complete the <br />project in the fall of 2011. <br />The project will be 90 Percent financed through a loan from the Colorado Water <br />Conservation Board with the 10 Percent balance and any unforeseen project overages <br />paid for by the Snowmass Water and Sanitation District. Repayment will be <br />accomplished using revenues from service fees, system development fees, and interest <br />on CD's. A financial analysis is presented showing the funding and repayment <br />schedule. <br />�,a u�. W Ulheeler nnd puvciates, Inc. Feasibility of Enlargment of Ziegler Reservoir <br />�'1 O1JaCar Rasaur¢�s fngin��rs Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.