Laserfiche WebLink
Emergency Loan Application and Feasibility Study GREEN DITCH COMPANY <br />amount during the 2014 irrigation season. The various stakeholders have indicated that this is <br />not the most environmentally sensitive approach. The Green Ditch Company is willing to <br />investigate the Alternative 3 approach with the understanding that the Green Ditch Company <br />cannot bear the costs of the "environmental improvement" components. Re- establishing the <br />Boulder Creek channel is estimated to cost approximately $200,000. <br />Cost Estimate <br />The Project Construction cost estimate, provided by Left Hand Excavating is $471,405 and is <br />further broken down as follows: <br />9 -- Environmental Controls <br />1 LS @ $8,500.00 <br />2 — Import and Place Common Fill Material <br />4500 Tons @ $20.50 = $92,250.00 <br />3 - Concrete Headwall on the outlet <br />1 LS @ $5,000.00 <br />4 — 38" x 60" RCP Pipe <br />800 LF @ $250.00 = $200,000.00 <br />5 — 6' Dia. Manholes <br />2 Each @ $6,000.00 = $12,000.00 <br />6— Diversion Structure with Head gate <br />1 LS @ $45,000.00 <br />7 — Boulder Weir Wall <br />1 LS @ $42,000.00 <br />8 — Rip Rap Bank Protection <br />150 TON @ $120.00 = $18,000.00 <br />9 — Upland Seeding <br />1 Acre @ $5,800.00 <br />Estimated Total Cost is $428,550.00 <br />10% Contingency is $42,855.00 <br />Total Budget Estimate for $471,405.00 <br />This budget Estimate does not include and Engineering, Survey and Permits or repairing the pond on the <br />south side of the project. A separate Grant Application for funds to pay for these items was submitted <br />to the Flood Recovery Grant Program. <br />Task <br />Cost <br />pest ;' <br />$40,000 <br />'eramttin'' <br />$10,000 <br />Construction <br />$429,000 <br />Otte' <br />CQntirigenc <br />$46,000 <br />Total <br />$525,000 <br />