My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150379 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150379 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2014 3:56:14 PM
Creation date
2/4/2014 3:56:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150379
Contractor Name
Wadley Farms Filing No. 3 Homeowner's Association
Contract Type
Loan
Water District
7
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 9:Wadley Farms No.3 Annual Headgate Deliveries with 5 FHL shares <br />(w/ 35% ditch loss) <br />Year <br />Total of <br />Year <br />Total of <br />Year <br />Total of <br />Year <br />'t <br />Total of <br />1950 <br />144.7 <br />1966 <br />98.0 <br />1982 <br />212.7 <br />1998 <br />95.4 <br />1951 <br />190.8 <br />1967 <br />214.0 <br />1983 <br />74.3 <br />1999 <br />149.5 <br />1952 <br />163.2 <br />1968 <br />171.2 <br />1984 <br />118.1 <br />2000 <br />106.2 <br />1953 <br />146.7 <br />1969 <br />198.1 <br />1985 <br />100.9 <br />2001 <br />151.6 <br />1954 <br />85.2 <br />1970 <br />258.1 <br />1986 <br />248.2 <br />2002 <br />135.1 <br />1955 <br />107.0 <br />1971 <br />194.1 <br />1987 <br />269.4 <br />2003 <br />298.9 <br />1956 <br />150.1 <br />1972 <br />198.9 <br />1988 <br />161.1 <br />2004 <br />146.1 <br />1957 <br />211.2 <br />1973 <br />179.5 <br />1989 <br />238.0 <br />2005 <br />160.7 <br />1958 <br />104.6 <br />1974 <br />178.7 <br />1990 <br />151.4 <br />2006 <br />151.4 <br />1959 <br />197.6 <br />1975 <br />147.4 <br />1991 <br />170.2 <br />2007 <br />193.6 <br />1960 <br />171.2 <br />1976 <br />173.6 <br />1992 <br />133.1 <br />2008 <br />212.3 <br />1961 <br />148.3 <br />1977 <br />160.5 <br />1993 <br />187.0 <br />207.0 <br />175.4 <br />2009 <br />196.9 <br />1962 <br />199.6 <br />1978 <br />166.6 <br />1994 <br />2010 <br />138.1 <br />1963 <br />131.8 <br />1979 <br />161.6 <br />1995 <br />2011 <br />172.4 <br />1964 <br />141.5 <br />1980 <br />119.3 <br />1996 <br />141.8 <br />2012 <br />137.0 <br />1965 <br />168.0 <br />1981 <br />141.5 <br />1997 <br />128.1 <br />Avg. <br />164.8 <br />Figure 13: Wadley Farms Headgate Deliveries with 3 and 5 FHL Shares <br />350 <br />300 <br />250 <br />200 <br />v <br />w <br />a <br />m 150 <br />100 <br />50 <br />0 <br />Comparison of Wadley Farms No. 3 Headgate Deliveries with 3 FHL Shares v. <br />5 FHL Shares <br />.0� <br />�O P MCP S � P 6'� O tJ Q 6, W "O P PO C.P. O 6 P 00 p IO �tJ <br />with 3 shares with 5 shares <br />Wadley Farms No. 3 Water Supply CWCB Loan Feasibility Study Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.