My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150379 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150379 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2014 3:56:14 PM
Creation date
2/4/2014 3:56:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150379
Contractor Name
Wadley Farms Filing No. 3 Homeowner's Association
Contract Type
Loan
Water District
7
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The acquisition of two additional FHL shares will increase the irrigation season deliveries <br />to which the HOA is entitled by 66° o over deliveries based on ownership of the current <br />three shares. However, it is not expected that reservoir delivery amounts during the non- <br />irrigation season will change with the availability of two new FHL shares. The reservoir <br />delivery amounts are based on the acre -foot ratio of the storage decrees for the Wadle} <br />Reservoirs to the total acre -feet decreed for storage under the 1936 Dunklee decree. <br />Therefore. total annual deliveries will not increase by 66 %, but will increase by an <br />average of '30.4%. The amount of water available to the HOA with purchase of the two <br />FHL shares is shown in Figure 12 and Table 9. <br />Figure 12: Wadley Farms No. 3 Headgate Deliveries with 5 FHL Shares <br />700 <br />600 <br />500 <br />(, <br />400 <br />w <br />(, <br />300 <br />200 <br />100 <br />0 <br />Projected Total Annual Wadley Farms No. 3 Headgate Deliveries with 5 <br />FHL Shares <br />ti (0 q2 0 ^d w O O b 0 O b (0 10 00 ON O� CS O� ti0 ^itJ h - - - IYh o _W 5 � <br />ti ti ti ti 21 ti ti ti ti ti ti ti ti 2v) 101, ti ti ti ti ti ti ti ti ti <br />R ti tiO tiO tiO tiO ti0 <br />■ Reservoir rights deliveries (Nov -Apr) FHL share deliveries (May -Oct) <br />A comparison of water deliveries at the Wadley Farms No. 3 headgate with three FHL <br />shares versus five FHL shares is shown in Figure 13. A comparison of average monthly <br />water deliveries with three FHL shares versus five FHL shares is shown in Figure 14. <br />Figure 15 shows the percentage increase in water deliveries with five FHL shares versus <br />three FIIL shares. <br />Wadley Farms No. 3 Water Supply CWCB Loan Feasibility Study Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.