Laserfiche WebLink
Table 16 - Infrastructure Cost Estimate (Combined Alternatives No 1 & 2) - <br />Greeley No. 2 Canal Delivery & Cache la Poudre Diversion <br />ItemNo. Description Estimated Quantity Unit Unit Price Cost <br />1 Replace and Enlarge Existing Ditch 6,000 LF $25 <br />$150,000 <br />2Replace Headgateat Greeley No. 2 Ditch 1EA <br />$16,000$16,000 <br />3 Furnish and Install 24 Inch PVC Pipe 2,300 LF <br />$150$345,000 <br />4Furnish and Install 36 Inch PVC Pipe 1,550$200$310,000 <br />5Check, Diversion, and Flow Measurement Structure 1EA $120,000$120,000 <br />1 <br />Pump Station No. 1 (10 CFS) <br />668$2,657$180,676 <br />1 <br />Pump Station No. 2 (20 CFS) <br />776$2,657$201,932 <br />2 <br />Miscellaneous Site Work 1LS <br />8$100,000$100,000 <br />3 <br />Access Road 4,300 LF $20 <br />9$86,000 <br />Dewatering Days <br />10100$1,000$100,000 <br />Outlet Flow Measurement Structure 1LS <br />11$45,000$45,000 <br />Total <br />$1,654,608 <br /> <br />Mobilization <br />5%$82,730 <br /> <br />4 <br />Engineering (Designand Construction Observation) <br />12%$198,553 <br />5 <br />Permitting <br />15%$248,191 <br />Contingency <br />20%$330,922 <br /> <br />Total <br />$2,515,004 <br />Notes: <br />1Raw water pump station assuming 60% pump efficiency and does not include the cost of electrical service <br />to the pump station. <br />2Miscellaneous site work includes revegetation, final grading, and miscellaneous riprap. <br />3Access Roads: $20/LF for moderate terrain and includes clearing, grubbing, grading, and road base. <br />4Increased engineering percentage to cover addition floodplain modeling for the check <br />structure being located in the Cache la Poudre River <br />5Increased permitting percentage for addition permitting for work within the normal high <br />water line of the river. Percentage could increase to 20% depending on the mitigation requirements. <br />FUND REQUIREMENT SCHEDULE <br />Theexpectedfundrequirementschedulefortheproject,withanestimatedproject <br />totalcostof$6.3 millionisasshownbelow.TheloanamountfromtheCWCBwill <br />be$4.5 million andtheportionfrom theTown of Windsorwillbe$1.8 million.The <br />scheduleofwhenthefundswill beneededisbasedon constructionstarting in 2013. <br /> <br />