Laserfiche WebLink
TheFundRequirementScheduleshowsthefundsrequiredbytheTown of <br />Windsor andtheCWCBtocomplete theproject.In2013 and 2014,fundswill <br />berequiredto purchase the infrastructure and complete the <br />storage facility. In2015fundswillberequiredfor the purchase of water. <br />From2014through2034,thepaymentrequiredfromtheCWCBistheannual <br />paymentforthe CWCBLoan. <br />Table 16 - Fund Requirement Schedule <br />Total Town of <br />FundsCWCB Windsor <br />YearRequiredLoanShare <br />2013-2014$5,300,000$4,500,000$800,000 <br />2015$1,000,000$0$1,000,000 <br />2014-2034$295,523$0$295,523 <br />Total <br />$4,500,000$2,095,523 <br />FINANCIAL ANALYSIS <br />The Town of Windsor proposes to apply for a loan amount $4.5 million from the CWCB <br />with a 20-year repayment period and an interest rate of 2.75%. The remaining portion <br />of the projectcost of $1.8 million will be funded by the Town of Windsor Water <br />Enterprise cash reserves. <br />The financial summary provides a summaryoftheproject costs, loanamounts,loan <br />payments, and cost peracre-foot(ac-ft)ofwater. <br />Table 17 - Financial Summary <br />Total Funds <br />ItemRequired <br />Estimated Project Cost$6,300,000 <br />CWCB Loan Amount$4,500,000 <br />Loan Interest Rate2.75% <br />Loan Duration20 years <br />CWCB Interest$1,410,456 <br />Project Cost Including Interest$7,710,456 <br />Annual CWCB Loan Payment$295,523 <br />Total Storage in acre-feet172 <br /> <br />