Laserfiche WebLink
Table 15 - Infrastructure Cost Estimate – Cache la Poudre River Diversion <br />ItemNo. Description Estimated Quantity Unit Unit Price Cost <br />1$25 <br />Furnish and Install 36Inch PVC Pipe 1,550$310,000 <br />2$ 16,000 <br />Furnish and Install 24Inch PVC Pipe 2,300$345,000 <br />3$ 150 <br />Check, Diversion, and Flow Measurement Structure 1EA $120,000 <br />1 <br />4Pump Station No. 1 (10 CFS) $ 2,657 <br />68$180,676 <br />1 <br />5 Pump Station No. 2 (20 CFS) $ 75,000 <br />76$201,932 <br />2 <br />6 Miscellaneous Site Work $20 <br />1$50,000 <br />3 <br />7Access Road $ 1,000 <br />4300LF $86,000 <br />8$ 45,000 <br />80Days $80,000 <br />9Outlet Flow Measurement Structure 1EA $45,000 <br />Total <br />$1,418,608 <br /> <br />Mobilization <br />5%$70,930 <br /> <br />4 <br />Engineering (Designand Construction Observation) <br />12%$170,233 <br />5 <br />Permitting <br />15%$212,791 <br />Contingency <br />20%$283,722 <br /> <br />Total <br />$2,156,284 <br />Notes: <br />1Raw water pump station assuming 60% pump efficiency and does not include the cost of electrical service <br />to the pump station. <br />2Miscellaneous site work includes revegetation, final grading, and miscellaneous riprap. <br />3Access Roads: $ 20/LF for moderate terrain and includes clearing, grubbing, grading, and road base. <br />4Increased engineering percentage to cover addition floodplain modeling for the check <br />structure being located in the Cache la Poudre River <br />5Increased permitting percentage for addition permitting for work within the normal high <br />water line of the river. Percentage could increase to 20% depending on the mitigation requirements. <br /> <br />