My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150366 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150366 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:08:10 PM
Creation date
12/13/2013 3:16:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-057
C150366
Contractor Name
Windsor, Town of
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SELECTED WATER RIGHTS ALTERNATIVE <br />The selected water rights are shares of New Cache direct flow rights and shares of Box <br />Elder Ditch Company. Out of the ditch water rights considered, these two water rights <br />run in close proximity to Kyger Reservoir and the infrastructure can be installed to <br />deliver both water sources directly into the reservoir. <br />The Town of Windsor has been actively looking for both of these water rights, but <br />currently does not have either water right under contract. <br />IMPLEMENTATION SCHEDULE <br />Table 12 –Implementation Schedule <br />TaskDate <br />Submit Feasibility Study to CWCBAugust 2013 <br />Purchase Kyger Reservoir InfrastructureDecember 2013 <br />Begin Design of Kyger Reservoir InfrastructureJanuary 2014 <br />Complete Design of Kyger Reservoir InfrastructureJune 2014 <br />Start Construction of Kyger Reservoir Infrastructure August 2014 <br />Complete ConstructionJanuary 2015 <br />INSTITUTIONAL CONSIDERATIONS <br />Entities that are, or may be, involved in the design, permitting, construction, and <br />financing of the project include: <br />1.Town of Windsor; financing and project management. <br />2.River Bluffs Ventures, LLC; design and construction of Kyger Reservoir. <br />3.Leonard Rice Engineers, Inc.; design and construction oversight of reservoir <br />water delivery and outlet infrastructure. <br />4.Clear Water Solutions; water rights purchasing, permitting <br />Lawrence Jones CusterGrasmick LLP; water rights purchasing, permitting, and legal <br />support. <br />The Town of Windsor will be the lead for the financing, design, and construction of the <br />project and will be the entity entering into contracts and agreements with the various <br />entities for the services provided by each. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.