Laserfiche WebLink
SELECTED WATER RIGHTS ALTERNATIVE <br />The selected water rights are shares of New Cache direct flow rights and shares of Box <br />Elder Ditch Company. Out of the ditch water rights considered, these two water rights <br />run in close proximity to Kyger Reservoir and the infrastructure can be installed to <br />deliver both water sources directly into the reservoir. <br />The Town of Windsor has been actively looking for both of these water rights, but <br />currently does not have either water right under contract. <br />IMPLEMENTATION SCHEDULE <br />Table 12 –Implementation Schedule <br />TaskDate <br />Submit Feasibility Study to CWCBAugust 2013 <br />Purchase Kyger Reservoir InfrastructureDecember 2013 <br />Begin Design of Kyger Reservoir InfrastructureJanuary 2014 <br />Complete Design of Kyger Reservoir InfrastructureJune 2014 <br />Start Construction of Kyger Reservoir Infrastructure August 2014 <br />Complete ConstructionJanuary 2015 <br />INSTITUTIONAL CONSIDERATIONS <br />Entities that are, or may be, involved in the design, permitting, construction, and <br />financing of the project include: <br />1.Town of Windsor; financing and project management. <br />2.River Bluffs Ventures, LLC; design and construction of Kyger Reservoir. <br />3.Leonard Rice Engineers, Inc.; design and construction oversight of reservoir <br />water delivery and outlet infrastructure. <br />4.Clear Water Solutions; water rights purchasing, permitting <br />Lawrence Jones CusterGrasmick LLP; water rights purchasing, permitting, and legal <br />support. <br />The Town of Windsor will be the lead for the financing, design, and construction of the <br />project and will be the entity entering into contracts and agreements with the various <br />entities for the services provided by each. <br /> <br />