My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Extension Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153623 Extension Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 1:47:36 PM
Creation date
10/1/2013 8:36:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />I 313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Kirk Russell, P.E. �� <br />Tim Feehan, P.E., Chief <br />Finance Section <br />DATE: July 1, 2011 (UPDATED July 18, 2011) <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />SUBJECT: Agenda Item 22a, July 12-13, 2011 Board Meeting <br />Finance Section — Changes to Existing Loans <br />Sanchez Ditch and Reservoir Company — Loan Payment Deferral Request <br />Introduction <br />The Sanchez Ditch and Reservoir Company (Company) has requested one annual loan payment <br />deferment from both of the Company's current CWCB Construction Fund loans (per letter received <br />on June 2, 2011 - attached). The purpose for this request is to help offset the Company's financial <br />burden related to urgently needed safety upgrades to the tramway/gondola system used to access the <br />outlet tower. The cost of the improvements is estimated to be about $27,000. The Company's two <br />CWCB loan payments total $31,385.92. CWCB Financial Policy #10 (attached) allows for <br />"providing project sponsors an opportunity to recover from periods financial difficulties.....or other <br />hardship beyond their control." The staff has reviewed the request, supporting documentation and <br />the Company's repayment history in preparation of the Staff Recommendation. <br />Staff Recommendation (Board approved Staff Recommendation as presented) <br />Staff recommends the Board approve the Sanchez Ditch and Reservoir Company's request for <br />financial relief by granting one annual loan payment deferment of principal and interest for Loan <br />Contracts C153623 and C153755A, totaling $31,385.92. The interest portion due within the <br />deferred payment will be transferred to principal, which will be reflected in the new amortization <br />schedules. Since the principal will be increased, the term of the loan will also need to be increased. <br />The Company will return to making its annual payments in 2012. <br />Interstate & Federal • Watershed & Flood Protection • Stream & Lake Protection • Finance <br />Water [nformation • Water Conservation & Drought Pianning • Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.