My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Extension Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153623 Extension Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 1:47:36 PM
Creation date
10/1/2013 8:36:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanchez Ditch and Reservoir Company Agenda Item 22a <br />July 1, 2011 (UPDATED July I8, 2011) <br />Page 2 of 4 <br />Background <br />The Company has two CWCB loans as shown in Table 1. The loans are in good standing with a <br />history of annual payments submitted on time. The loans were both for rehabilitation work to the <br />Sanchez Reservoir outlet and dam. <br />Table 1. CWCB Loan Contract Summary <br />Loan Contract Contract Current Final Annual 2011 2011 <br />Contract Dated Amount Balance Payment Payment Principal Interest <br />Number Due Amount Payment Payment <br />Portion Portion <br />C153623 8/20/1992 $200,000 $71,588 2017 $11,485.57 $9,338.82 $2,146.75 <br />C153755A 9/3/1997 $335,000 $194,459 2022 $19,900.35 $13,465.60 $6,434.75 <br />Totals $535,000 $266,017 $31,385.92 $22,804.42 $8,581.50 <br />The Sanchez Reservoir outlet includes a 150 foot free standing concrete inlet gate tower. The tower <br />houses the outlet gate valves for the Reservoir. In order to access the gates to operate the dam the <br />Company utilizes a tramway/gondola which runs on a fixed cable and is powered by a portable <br />gasoline generator that winches the gondola from shore to tower. All gate valves in the tower aze <br />manually controlled from the top of the tower. Daily access to the tower is required during the <br />irrigation season. Due to dam safety concerns and the reliability/safety of the tramway/gondola <br />system for gate operations, the Company needs urgent upgrades to the tramway/gondola system. <br />The Company has requested and received approval of a$95,000 grant ($10,000 Basin &$85,000 <br />Statewide) from the Rio Grande Basin Roundtable on May 10, 2011. This WSRA grant will be <br />considered by CWCB at the September 2011 Board meeting. The grant will cover additional <br />rehabilitation and upgrades needed to bring the system into compliance with SEO - Dam Safety and <br />allow for more efficient operations. <br />Sanchez Ditch and Reservoir Company <br />The Sanchez Ditch and Reservoir Company is a Colorado Mutual Ditch Company, incorporated in <br />1956. The Company serves about 22,400 acres (13,400 irrigated acres) in Costilla County. The <br />Company's system includes Sanchez Reservoir, Culebra Sanchez Canal, Mesita Reservoir, Culebra <br />Eastdale Canal other canals and ditches. Sanchez Reservoir serves 34 shareholders with a total of <br />21,802 shares. Irrigated crops include potatoes, wheat, barley, oats, alfalfa and hay. Sanchez <br />Reservoir was built in 1910 with a dam height of 135 feet and a storage capacity 103,114 acre-feet. <br />Project <br />The Project includes making essential operational and safety repairs and installation of an <br />automated hydraulic system, which will allow the SEO - Dam Safety required drawdown capability <br />of 1 foot per day over 5 days. The configuration of the gondola and tower will be evaluated with the <br />goal of achieving optimum operational efficiency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.