My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150251 Contract Docs
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150251 Contract Docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 10:10:43 AM
Creation date
8/1/2013 11:41:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150251
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />and specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as -built <br />drawings of the PROJECT to the CWCB staff, or, if required by § 37 -87 -105, C.R.S., <br />the BORROWER shall provide the as -built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br />SECTION 9 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB- approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />M. PROJECT- related expenses incurred prior to the Effective Date of this contract in <br />Appendix 1 to Loan Contract C150251 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.