My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150251 Contract Docs
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150251 Contract Docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 10:10:43 AM
Creation date
8/1/2013 11:41:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150251
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
accordance with the approval of this loan. <br />10 — DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />contains a statement of the PROJECT costs expended for that period and shall <br />forward said statement to the CWCB. After receipt of the periodic progress report <br />from the BORROWER, and review and acceptance of the items therein as eligible <br />expenses as described below, the CWCB will pay to the BORROWER the amount set <br />forth in the report or such portion that has been approved by the CWCB. Such <br />payment shall be made within thirty (30) days from the CWCB's approval of each <br />progress report. <br />SECTION 11 — TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />signed by the State Controller or his designee). <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract <br />Appendix 1 to Loan Contract C150251 <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.