My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150251 Contract Docs
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150251 Contract Docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 10:10:43 AM
Creation date
8/1/2013 11:41:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150251
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MVIC for Adjustment of Water Rights and Sale of the Use of Irrigation Water, Dolores <br />Project, Colorado River Storage Project" (Articles 4, 6, 7 and 8), and the "Contract <br />Among the United States and DWCD, MVIC and the Ute Mountain Ute Tribe <br />Providing for the Adjustment of Water Rights and for the Rehabilitation, Operation, <br />Maintenance and Replacement of Facilities to Reduce Salinity Inflow to Colorado <br />River" (Articles 5 and 6). <br />SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100 %) interest in the May Lateral Pipeline, with a length of <br />approximately five miles, as more particularly described in the attached Deed of Trust <br />( "Collateral "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />The CWCB approved the loan with the following conditions: <br />a. The CWCB has received a parity position with the Dolores Water Conservancy <br />District on the Borrower's assessment revenues. <br />b. Any funds received by the Borrower from NRCS (USDA) related to the May <br />Lateral Pipeline shall be submitted by the BORROWER to the CWCB an amount <br />equal to the NRCS reimbursement within ten (10) working days after receipt of <br />the reimbursement. The NRCS reimbursement will be applied to the outstanding <br />principal loan balance, and the Loan Contract shall be amended to the reduced <br />loan amount. <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER's and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />Appendix 1 to Loan Contract C150251 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.